Acrylicon logo
Workers in a new process plant with white seamless flooring and large black pipe columns

For businesses and contractors, installation time is a decisive factor, or more descriptively: The time from when the solution is installed until it can be put into use. All resin floors must cure before they can be used, and in many industries, long curing time is synonymous with increased downtime, lost revenue and higher costs.


Acrylicon is ready for use after just 1 hour and fully cured after 2 hours. In many cases, we install or repair floors overnight, so that the customer’s operations can continue as normal the next morning.

By comparison, epoxy and PU floors require several days to achieve full curing depending on the substrate temperature. For many of our customers, the costs of halting production or other operations are far higher than the floor investment itself. Choosing a fast-curing floor pays for itself – both during installation and every time the floor needs to be repaired or adapted to new needs.

With Acrylicon you get a floor that cures quickly, withstands loads immediately and minimises operational disruptions – an investment that pays off both in the short and long term.

Curing time for different products

  • Epoxy
    Dust dry after 24 hours; fully cured after 7–14 days
  • Polyurethane
    Dust dry after 3–5 hours; fully cured after 3–5 days
  • Acrylic/MMA
    Fully cured after 1–2 hours
  • AcryliCon
    Fully cured after 1–2 hours

If an epoxy or polyurethane floor is exposed to mechanical or chemical stress, including cleaning, before it has fully cured, the curing process may be disrupted. The floor may then fail to reach the properties stated in its technical data sheet, which can shorten its service life and increase maintenance needs.

Lower lifecycle costs

Contact us

With nearly 50 years in the market, we are a leading provider of consulting and installation of industrial flooring
Read more