Specified for ease of installation and long-term durability — AO Arena, Manchester
Entertainment

The ambitious £30 million overhaul of AO Arena included the refurbishment of entrance and back-of-house areas, as well as the creation of The Mezz — a new luxury mezzanine with restaurants, hospitality areas, and a completely new viewing experience.
With tight deadlines and highly robust finishes required throughout the construction process, AcryliCon was selected to deliver flooring solutions across the venue — from public concourses and stairs to VIP bars and external areas.
Reference
The Solution: A full range of resin systems across the entire venue
AcryliCon delivered a comprehensive flooring solution covering all key areas of the arena refurbishment. AcryliCon Décor was applied throughout the concourse, stairs, toilets and bar cellars — providing durable, visually appealing surfaces suited to high footfall. AcryliCon Composite Terrazzo was used in the VIP bar and lounge area, delivering a premium finish that complements the luxury hospitality offering. AcryliCon Multi-Grip was installed on the external concourse and back-of-house areas, ensuring slip resistance and durability in exposed conditions.
Project facts
• Venue: AO Arena, Manchester
• Contractor: Galliford Try (North West)
• Project value: £30 million refurbishment
• Duration: 6 months
• Products: AcryliCon Décor · Composite Terrazzo · Multi-Grip
• Areas: Concourse · Stairs · Toilets · Bar Cellars · VIP Bar/Lounge · External concourse
What the client said
“The AcryliCon team and product was provided on the AO Arena to meet the tight deadlines and highly robust finishes necessary to allow construction works to progress after floor laying undertaken — with very limited curing times. The management were extremely helpful and supportive in the selection of materials and assisted the design/procurement process from concept through to execution. The products provided have proven to be extremely robust on the event floor level and have lasted through construction into use with little to no effect on the product. The service has been excellent throughout. The site application team worked tirelessly to hit deadlines and often worked above and beyond what they should.”
Steve Shorrock, Operations Manager, Galliford Try (North West)

Contact us
Interested in a similar solution for your project?
Contact us ›